Pump (Graham Seed Treater – G3)

The applicator is attached to auger and then the flow rate calibrated using water.

In this set-up JumpStart is applied to the wheat and then stored in a bin for seeding later.

JumpStart is mixed directly in the pump's tank.

The coverage is checked along the way.

You will need Quicktime to view videos on this site. It is available for free for both Windows and Mac at quicktime.apple.com.